Roof lantern upstands in Moray
Across Moray, roof lantern upstands are quoted to the external kerb size, with delivery confirmed for your postcode and fitting available on request.
Get a price in Moray
Send your postcode and kerb size for a fixed written quote.
Choosing roof lantern upstands in Moray
Insulated upstands and kerbs that raise the lantern above the roof finish.
Across Moray, the shortest day brings around 6h 33m of daylight and the midsummer sun reaches about 55.8° at noon. A lantern collects light from the bright overhead sky all year, and the right glass keeps the long summer days comfortable.
- Made to match the lantern's external size
- Level and square for a correct fit
- Roof membrane dressed up the outside
- Lifts the lantern clear of the roof finish
Delivery and fitting in Moray
Delivery to mainland postcodes here is priced for your postcode and confirmed in writing before you order. Some districts, such as IV30 and IV36, are Highlands, islands or remote postcodes and are delivered by arrangement.
Fitting can be quoted where we have cover; send your postcode and photos of the roof and kerb and we will confirm before quoting.
Roof lantern upstands guide prices
Guide prices for an insulated upstand on its own, by lantern size, including VAT:
| Lantern kerb size | Perimeter | Insulated upstand, guide |
|---|---|---|
| 1200 × 1200 mm | 4.8 m | £245£204 ex VAT |
| 1000 × 1500 mm | 5.0 m | £245£204 ex VAT |
| 1000 × 2000 mm | 6.0 m | £295£246 ex VAT |
| 1000 × 2500 mm | 7.0 m | £295£246 ex VAT |
| 1000 × 3000 mm | 8.0 m | £345£288 ex VAT |
| 1500 × 1500 mm | 6.0 m | £295£246 ex VAT |
Guide prices include VAT at 20%, upstand only, supply only. Upstands are made to match the lantern's external size; your fixed price is confirmed in writing before you order.
Planning and building regulations in Moray
Here the Building (Scotland) Regulations and the domestic Technical Handbook set the standards, with a building warrant usually required for extension work.
Your council will confirm whether your lantern is permitted development under Scotland's rules, particularly for listed buildings.
Building regulations are checked by your local authority building standards (verifier) service. Some like-for-like replacement work does not need a building warrant but must still meet the building standards. Your council's building standards service can confirm.
Sources: Building standards technical handbooks, gov.scot · Do I need planning permission?, mygov.scot
Roof lantern upstands in Moray: questions
Can I order a lantern before the upstand is built?
Yes, if you build the upstand to the lantern's stated external size. Many people order the lantern and upstand together so they match.
What height should my upstand be?
High enough to keep water away from the lantern seal, commonly at least 150 mm above the finished roof surface. Follow the instructions for your chosen range.
Who makes the upstand weatherproof?
Your roofer, by dressing the roof membrane up the outside of the upstand. The lantern then sits over it.
Do I need planning permission for a roof lantern in Moray?
Often not, but it depends on the roof, the property and whether it is listed or in a conservation area. Check with your council before ordering.