Roof lantern upstands in Downpatrick
For roof lantern upstands in Downpatrick, start with the guide prices on this page, then send photos and measurements for a fixed written quote covering BT30.
Price a roof lantern upstand for Downpatrick
Postcode and kerb size first, then your details. We reply with a fixed written quote.
Lantern upstands for Downpatrick projects
Insulated upstands and kerbs that raise the lantern above the roof finish.
On the shortest day Downpatrick gets about 7h 18m of daylight, with the sun only 12.2° above the horizon at noon. Light from the sky overhead is the brightest available in winter, which is exactly what a roof lantern collects.
- Prefabricated insulated or site-built timber
- Made to match the lantern's external size
- Level and square for a correct fit
Delivery and fitting in Downpatrick
Your quote includes delivery to Downpatrick at a confirmed price, usually to the kerbside or driveway on pallets.
Need it fitted? Send your postcode and we will confirm whether we have fitting cover in Downpatrick before quoting.
Delivery to Northern Ireland is by arrangement: we confirm the carrier, any sea-freight charge and the date on your quote before you order.
Roof lantern upstands guide prices for Downpatrick
Guide prices for an insulated upstand on its own, by lantern size, including VAT:
| Lantern kerb size | Perimeter | Insulated upstand, guide |
|---|---|---|
| 1200 × 1200 mm | 4.8 m | £245£204 ex VAT |
| 1000 × 1500 mm | 5.0 m | £245£204 ex VAT |
| 1000 × 2000 mm | 6.0 m | £295£246 ex VAT |
| 1500 × 3000 mm | 9.0 m | £345£288 ex VAT |
Guide prices include VAT at 20%, upstand only, supply only. Upstands are made to match the lantern's external size; your fixed price is confirmed in writing before you order.
Planning and building regulations for Downpatrick
Energy standards for lanterns in Northern Ireland come from the Building Regulations (NI) 2012 and Technical Booklet F1.
Check Northern Ireland's permitted development rules with your district council, especially for listed buildings and conservation areas.
Building regulations in Downpatrick are checked by your district council's building control service. Replacement and new rooflights are controlled work in most cases. Your council's building control service will confirm whether an application is needed.
Sources: Building Regulations, Department of Finance NI · Planning permission: when to apply, nidirect
Questions from Downpatrick
What height should my upstand be?
High enough to keep water away from the lantern seal, commonly at least 150 mm above the finished roof surface. Follow the instructions for your chosen range.
Who makes the upstand weatherproof?
Your roofer, by dressing the roof membrane up the outside of the upstand. The lantern then sits over it.
Do I need planning permission for a roof lantern in Downpatrick?
Often not, but it depends on the roof, the property and whether it is listed or in a conservation area. Check with your district council before ordering.
Can you fit a roof lantern in Downpatrick?
We can quote for fitting where we have cover. Send your postcode and photos of the roof and kerb, and we will confirm before quoting.